Establishment of minimum required height when one track over another (Over/Under Clearance)
During design process tracks can be placed over another. Software immediately establish a minimal distance between tracks and asks for slope definition which is allredy defined as function in the RailModeller.
75
votes
Dubravko Lušičić
shared this idea
Minimum height checks / warnings are scheduled for a future update!
-
The existing "where to place trestle" collision detection algorithm from the 3D visualization module can be utilized as the basis for the implementation of the "Minimum Over/Under Clearance" feature.